|
Originally Posted by bray
|
Annikan,
My bad should have been more clear. I am referring to the assembly of the power package at the side 10-21B.
Can you comments on the benefits of this.
Sorting through the Instuctor's Textbook!
B-Ray
|
Sweep Loading + Right Forearm Level to the ground (any right forearm motion) = Side Assembly Point
See acquired motion......12-5-2.
DG